Lowry House Case Study

Challenge:

Lowry House faced a critical fire safety concern due to its existing cladding system. Following a comprehensive fire safety assessment, Full Works Projects was appointed to deliver a high-quality recladding solution that met stringent fire safety regulations.

Solution:

Full Works Projects implemented a market-leading rainscreen cladding system featuring a high-performance CS1 render finish.

Benefits:

  1. Durable and Aesthetically Pleasing Finish:
  • Applied a 1.5mm Silicone Topcoat CS1 for exceptional weather resilience and visual appeal.
  • Ensured the render’s longevity, contributing to the building’s overall aesthetics.
  1. Superior Thermal Performance:
  • Installed 180mm High Density Mineral Wool insulation, enhancing thermal performance and energy efficiency.
  • Potential reduction in heating and cooling costs for residents.
  1. Enhanced Fire Safety and Weatherproofing:
  • Achieved the highest Euroclass A1 fire rating, ensuring non-combustibility and enhanced fire safety.
  • Facilitated rapid installation to minimize disruption for residents and quickly weatherproof the building envelope.
  1. Additional Aesthetic Improvements:
  • Incorporated Rockpanel to create a stunning façade that’s sustainable and uses environmentally friendly materials.

Results:

Fire Safety: Achieved highest Euroclass A1 rating, significantly improving fire safety.

Energy Efficiency: Improved thermal performance leading to potential cost savings.

Aesthetics: Enhanced building appearance with durable and visually appealing finishes.

Project Efficiency: Rapid installation minimized disruption and protected the building during construction.

Brochure Image

Lowry House Case Study

Our high-performance CS1 render finish and 180mm Mineral Wool insulation
not only improved energy efficiency but also achieved the highest Euroclass A1 fire rating.

Download Case Study