Challenge:
Lowry House faced a critical fire safety concern due to its existing cladding system. Following a comprehensive fire safety assessment, Full Works Projects was appointed to deliver a high-quality recladding solution that met stringent fire safety regulations.
Solution:
Full Works Projects implemented a market-leading rainscreen cladding system featuring a high-performance CS1 render finish.
Benefits:
- Durable and Aesthetically Pleasing Finish:
- Applied a 1.5mm Silicone Topcoat CS1 for exceptional weather resilience and visual appeal.
- Ensured the render’s longevity, contributing to the building’s overall aesthetics.
- Superior Thermal Performance:
- Installed 180mm High Density Mineral Wool insulation, enhancing thermal performance and energy efficiency.
- Potential reduction in heating and cooling costs for residents.
- Enhanced Fire Safety and Weatherproofing:
- Achieved the highest Euroclass A1 fire rating, ensuring non-combustibility and enhanced fire safety.
- Facilitated rapid installation to minimize disruption for residents and quickly weatherproof the building envelope.
- Additional Aesthetic Improvements:
- Incorporated Rockpanel to create a stunning façade that’s sustainable and uses environmentally friendly materials.
Results:
Fire Safety: Achieved highest Euroclass A1 rating, significantly improving fire safety.
Energy Efficiency: Improved thermal performance leading to potential cost savings.
Aesthetics: Enhanced building appearance with durable and visually appealing finishes.
Project Efficiency: Rapid installation minimized disruption and protected the building during construction.
Lowry House Case Study
Our high-performance CS1 render finish and 180mm Mineral Wool insulation
not only improved energy efficiency but also achieved the highest Euroclass A1 fire rating.