James Watt Way Case Study
Erith, South-East London
Project Challenges This wasn’t a straightforward install. The system was being replaced as part of...

Project Challenges This wasn’t a straightforward install. The system was being replaced as part of...
Graphite Square is a landmark mixed-use development delivering a refined urban living experience in the...
Challenge: The Aurora Apartments were one of several ‘high priority buildings in Scotland to be included...
Challenge: Lowry House faced a critical fire safety concern due to its existing cladding system. Following...
Completed in November 2015, this mixture of solid brick, REEMA, Tru Steel, No Fines and Old Tanks refurbishments...
New student accommodation part of development across three sites for additional teaching space, student...
122 properties in the Priory area of Wellington have been totally transformed with the application of...
The Objective The Sedgewick and Barwick high rise building in Bristol is council owned and has been in...
Nestled alongside the Mumbles Mile, Sandfields in Swansea was declared a renewal area in January 2014...
Since March 2018, residents of Cumberland Towers have been enjoying the completion of £1.8m of repairs...
Quality is high on the list for the development of modern student accommodation. Student Housing Company,...
SPSenvirowall Products Help Regeneration of City Centre Site. A 1960’s shopping centre in Newcastle...
Kew Bridge West is a contemporary collection of a 336 private apartments located within a number of buildings...
This is a fast track construction of student accommodation in the centre of Cardiff. The frame of the...
The Sterte Court development comprises of 20 apartments over four storeys, 18 of which belong to RSL,...